Position and level
Pan set level and aligned to the waste outlet centre for proper drainage

Ahmadi
Western toilet installation at Ahmadi Stables starts with levelling the floor and ensuring the waste line slopes steadily toward the main trap. We connect cold supply and waste pipes, fit the cistern, and test all seals for leaks before handover.
The stables and administrative buildings at Ahmadi Stables need separate toilet facilities with strict cleanliness and fast drainage standards. We check the toilet's distance from the main drainage point and the available floor fall, because stables often have exposed floor drainage prone to moisture and sand ingress. We run flowing water through every joint before finish to ensure no urine or water seeps beneath the concrete.
Ahmadi Stables sits in Ahmadi governorate near the racing track, a specialized zone for equestrian care and horse facilities.
Each toilet is tested by filling and emptying the cistern three times in succession to confirm no joint leaks under pressure.
Pan set level and aligned to the waste outlet centre for proper drainage
Wax ring or rubber gasket fitted between pan base and the floor outlet flange
Braided flexible supply tail and a dedicated isolation valve fitted to the cistern
Cistern mounted and float valve adjusted for correct fill level and full flush
Sanitary silicone bead around the pan base stops water tracking under the tile
Multiple flush cycles run immediately after fitting to confirm all joints are dry
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Concrete is always better because it gives a level surface and prevents the pan settling or shifting over time. We set the base and pan to exact level and check the waste outlet from underneath for any kinks.
We run a new waste pipe with a steady fall of at least one in one hundred from the pan to the main line. If the fall is inadequate we raise the outlet visibly or request ground levels to be adjusted.
