Position and level
Pan set level and aligned to the waste outlet centre for proper drainage

Mubarak Al-Kabeer
Installing a Western toilet in Masayel starts by lifting or removing the old pan to set a new model in its place. We level the floor, position the pan precisely, connect waste and supply lines, and test everything before handing over.
Many Masayel houses are older with cramped bathrooms on uneven floors and waste pipes already buried below ground. When replacing an old pan, we test the drain line first with running water to check for blockage, and if we find pooling beneath the floor we may need to raise the pan or reset the pipe fall. Tight bathrooms mean wall-to-pan clearance is fixed, so we position the cistern carefully to fit the depth available.
Masayel is a residential district in Mubarak Al-Kabeer governorate, where most toilet replacements require assessing old floors and existing drainage.
We fill the cistern three times in a row and test flow and flush quality because older pipes need extra confirmation.
Pan set level and aligned to the waste outlet centre for proper drainage
Wax ring or rubber gasket fitted between pan base and the floor outlet flange
Braided flexible supply tail and a dedicated isolation valve fitted to the cistern
Cistern mounted and float valve adjusted for correct fill level and full flush
Sanitary silicone bead around the pan base stops water tracking under the tile
Multiple flush cycles run immediately after fitting to confirm all joints are dry
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, if the existing drain has sufficient fall. We measure the trap height and slope, set the new pan at the same level and connect it directly, then reset small tiles around the base.
Before installation we snake the line carefully and test it with running water. If blockage persists we may need to break part of the floor to access the pipe, and we tell you this beforehand.
