Position and level
Pan set level and aligned to the waste outlet centre for proper drainage

Capital
Western toilet installation in Mirqab begins with measuring the space from wall to pan, then fitting the cistern securely. We fill the tank, run the flush and valve closure, and check for leaks before leaving.
Mirqab contains the Central Market, shops and old residential houses with pipes chased into walls and vertical stacks behind tile. Old pipes are often flush against interior walls with no space for modern wide pans. We measure the clearance first and choose a compact pan or corner position to avoid extra tile breaking. Then we test waste flow from below and confirm water drains quickly before closing the wall.
Mirqab sits in Kuwait governorate near the Grand Mosque and Central Market, an older district with tight bathroom layouts.
Before final fixing, we cap the pan temporarily and pump water from the cistern to test drain speed without waste.
Pan set level and aligned to the waste outlet centre for proper drainage
Wax ring or rubber gasket fitted between pan base and the floor outlet flange
Braided flexible supply tail and a dedicated isolation valve fitted to the cistern
Cistern mounted and float valve adjusted for correct fill level and full flush
Sanitary silicone bead around the pan base stops water tracking under the tile
Multiple flush cycles run immediately after fitting to confirm all joints are dry
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
In rare cases, if the vertical stack is sound and the old pan position suits the new one. We crack the cement bed around the old pan and slide it out carefully, then fit the new one. But most cases need complete removal and a fresh build.
We use a high-pressure pump to clean the pipe from below before fitting the new pan. If the blockage is deep in the wall, we open a side access point and clear it by hand, then flush with force to confirm clearance.
