Draining and deep clean
Sediment, algae and corrosion residue removed before any prep begins

Farwaniya
Epoxy tank lining in Jleeb Al-Shuyoukh usually addresses aging tanks in dense houses needing quick assessment. We drain the tank with a pump, scrape the walls and apply epoxy in two passes, then video the interior before handover.
Jleeb Al-Shuyoukh is a dense market area where houses sit close together and ground tanks are relatively small. Deposits build up fast in these tanks from desalinated water and old pipes. We drain the tank and scrub thick sediment with a strong wire brush, and if heavy rust exists we scrape to bare metal. After that we blow dry and coat with epoxy to form a new protective barrier.
Jleeb Al-Shuyoukh is in Farwaniya and is a busy residential commercial area where most houses have underground tanks.
We send camera images after each epoxy pass to confirm no thin spots or voids remain.
Sediment, algae and corrosion residue removed before any prep begins
Walls and floor abraded so the epoxy bonds without lifting or bubbling
Two-coat system builds uniform thickness across all internal surfaces
Fine cracks sealed with filler compound before coating, not over them
Internal camera confirms full coverage and detects any early delamination
Tank refilled only after the epoxy has fully cured, confirmed on site
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
The tank must be completely empty before we arrive. We use a strong pump to suction any remaining water and all sediment from the bottom quickly.
No, you must wait at least three days for the epoxy to fully cure. Six days is better if the weather is humid or temperatures are cool.