Draining and deep clean
Sediment, algae and corrosion residue removed before any prep begins

Ahmadi
Epoxy tank lining in Julaiaa begins with suctioning residual water then scraping peeling paint and salt buildup from walls. We high-pressure clean and allow complete drying before applying epoxy coats and complete the job with internal camera inspection.
Julaiaa's southern tanks are mostly on farms and small factories with medium capacity and relatively thin concrete walls. The main issue is water seeping through fine cracks and internal corrosion leaving white sediment on the floor and sides. Epoxy completely seals these cracks and stops water pressure from pushing against walls from inside. We measure coat thickness with a gauge after finishing to confirm we have met the required thickness.
Julaiaa is a desert area in southern Ahmadi where farms and commercial operations depend on sealed storage tanks.
We perform HD camera inspection after complete drying to document any coating defects before tank handover.
Sediment, algae and corrosion residue removed before any prep begins
Walls and floor abraded so the epoxy bonds without lifting or bubbling
Two-coat system builds uniform thickness across all internal surfaces
Fine cracks sealed with filler compound before coating, not over them
Internal camera confirms full coverage and detects any early delamination
Tank refilled only after the epoxy has fully cured, confirmed on site
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, it needs full curing for at least twenty-four hours. We leave the tank ventilated for six additional hours after drying.
Wide cracks are filled with thick epoxy putty before liquid coating. This prevents air from remaining in the cracks and ensures permanent sealing.
