Inspection and mapping
Internal camera maps every crack and spalled area before work starts

Capital
Tank restoration in Kuwait City starts with draining sediment and silt from the bottom and inspecting concrete walls for cracks and seepage. We flush the tank under high pressure, apply internal protective coating and test water quality before returning it to service.
In Kuwait City towers and administrative buildings near Liberation Square, roof tanks take heavy daily flow and hold pressure constantly. The inner walls suffer corrosion from water salts and rust in the concrete reinforcement. We measure wall thickness on each side and the floor with a gauge to decide whether protective coating alone will work or whether we need to inject cement grout to seal hairline cracks.
Kuwait City is the capital with concentrated high-rise buildings and large tanks, meaning strict periodic maintenance of internal systems is essential.
We test water leaving the tank after restoration to check for particles or discolouration because contaminated flow clogs natural filters.
Internal camera maps every crack and spalled area before work starts
All scale, efflorescence and loose material removed before any filler is applied
Hydraulic mortar seals active and dry cracks in concrete walls and floor
Repair render restores corroded or pitted wall surfaces to a uniform face
Drinking-water rated coating applied over fully cured and prepared surfaces only
Camera confirms coating integrity and joint sealing before the tank refills
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Usually two days: one for draining, inspection and flushing, one for applying protective coating and curing. If we find cracks needing cement injection, one extra day may be needed.
We use epoxy coating approved for human water tanks, not industrial use. The coating cures fully before refilling and we verify it by chemical testing.
