Pressure line leaks
A flexible camera enters the supply line and films the crack position

Farwaniya
Filming drainage lines with a camera in Dajeej reveals cracks in pipes caused by shifting sand beneath homes. We feed the camera from a nearby pit and record fractures and joint displacement. We count the faults and locate them precisely for repair planning. The image beats guesswork.
Dajeej sits at the desert fringe, and its sandy soil shifts slightly with changes in moisture and heat. This causes uneven settlement beneath foundations, and drainage lines running under the courtyard or below house walls endure this movement. Pipes may shift from their joints or crack in the metal or earthenware body. The camera penetrates each section and shows where mechanical stress has affected the pipe.
Dajeej lies in Farwaniya governorate, a borderland zone where the ground undergoes seasonal movement affecting foundation and pipe stability.
We film slowly at joints because joint displacement may be only a fraction of a millimetre and is hard to spot at high speed.
A flexible camera enters the supply line and films the crack position
A second run after repair confirms the fault is sealed while the customer watches
Camera footage reveals mineral scale narrowing the bore before a full blockage forms
Old galvanised iron corrodes internally; camera footage assesses remaining wall thickness
Filming the buried run identifies the fault and avoids random breaking across the floor
Full video record of the line documents pipe condition for future maintenance planning
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Surface cracks may be patched temporarily with metal tape from outside. But if cracks are deep or joints are shifted, the damaged section must be replaced. The camera determines crack depth with precision.
Heavy movement occurs in the first and second year after building. After that it decreases but does not stop entirely in sandy soil. Flexible pipes tolerate minor movement better than rigid pipes.
