New pipe runs
Cold and hot supply lines routed to fixtures and tanks.

Ahmadi
Water pipe runs in Hadiya start with a site survey, as new houses here sit on solid foundations with complex underground networks. We mark safe routes clear of power cables and waste pipes and liaise with the municipality to prevent damage. Pipes are buried at uniform depth and to a steady gradient standard.
Hadiya houses are new and contractors often pour deep foundations and thick concrete slabs, meaning trench digging needs heavy gear and careful planning. We obtain a copy of building drawings to avoid striking reinforced footings. After burial we lay warning tape above pipes for easy tracking later.
Hadiya lies in Ahmadi governorate near Ahmadi Town, a modern residential development district where underground utilities are highly complex.
Before burial we lay a plastic test conduit beneath the soil surface and pull a nylon wire through its full length for easier future maintenance.
Cold and hot supply lines routed to fixtures and tanks.
Leak located acoustically and by camera before any breaking.
Wrapping exposed or roof-level pipes against heat and condensation.
Removing mineral scale that narrows the pipe wall over time.
Targeted clearance of blocked supply lines without unnecessary breaking.
Internal camera pass and pressure check before pipes are concealed.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but under soil or sand with enough depth for protection from heat and impact. Running pipes directly above the slab exposes them to rapid thermal expansion and cracking. The best route is through pre-drilled holes in the slab itself.
We review the original pipe blueprint and use a metal detector to trace old pipe routes before digging. Where runs cross, we raise new pipes above old ones with safe clearance and secure clamps.
