New pipe runs
Cold and hot supply lines routed to fixtures and tanks.

Hawalli
Pipe runs in Nuqra involve multi-storey apartment buildings with old shared networks between units. We inspect pipes inside concrete block and reinforced walls and identify weak sections and inefficient routes. Where the original path is complex we run a parallel line that avoids sharp bends and tight angles. Every new run is tested under full pressure before walls are closed.
Nuqra apartment blocks are built with thick concrete block walls where original copper pipes are fixed at sharp angles inside them. These acute angles weaken the metal and cause slow leaks after years. When repair or replacement is needed we carefully open a wall section and choose between pulling out the old pipe and replacing it or fitting a new line on the surface or in conduits. The choice depends on tenant approval and wall condition.
Nuqra is in Hawalli governorate near Salmiya and contains medium-rise apartment buildings built in the seventies and eighties.
Before cutting a wall we X-ray the pipe location to avoid cutting hidden steel or wires.
Cold and hot supply lines routed to fixtures and tanks.
Leak located acoustically and by camera before any breaking.
Wrapping exposed or roof-level pipes against heat and condensation.
Removing mineral scale that narrows the pipe wall over time.
Targeted clearance of blocked supply lines without unnecessary breaking.
Internal camera pass and pressure check before pipes are concealed.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we seal the old pipe with safe cement filler and secure the new pipe to the wall with metal brackets that support the weight. This avoids cutting more walls but needs neighbour approval if the line crosses a shared wall.
If the line runs on wall surfaces three to four hours cover cutting, fixing and testing. If walls must be opened one full day is needed because walls must equilibrate moisture after repair before plastering.
