Camera inspection
Internal footage shows scale thickness and exact location before work starts

Ahmadi
Pipe cleaning at Zour targets cooling and supply lines feeding the power generation and desalination stations. High water temperatures and heavy pressure accelerate salt and scale buildup in steel pipes. We inspect from access points and pump at controlled pressure until cooling flow returns to design efficiency.
Zour power and desalination station relies on a complex network of steel cooling pipes that draw seawater and recirculated water from the main plant, returning it at a set temperature. Scale builds rapidly in return mains where water is hottest, reducing cooler and fan efficiency. We locate inspection points at the main pump station and open the return line cover, send a camera to film the internal bore, then pump at 100 bar while monitoring pressure readings on both sides of the network.
Zour sits in Ahmadi governorate next to the power plant, an industrial zone where stable water flow is essential.
We measure outlet water temperature from each cooler before and after cleaning to confirm scale no longer blocks heat exchange.
Internal footage shows scale thickness and exact location before work starts
Breaking down calcium deposits that gradually narrow the pipe bore
Flushing loosened deposits out of the line under controlled water pressure
Targeted treatment for iron pipes corroding internally and trapping rust scale
Removing mineral build-up from mixer aerators and inline strainers
Second camera pass and pressure reading confirm a clean line to the customer
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, if the station has dual cooling lines in parallel. We isolate one line with stop valves, clean it while the other runs, then switch.