New pipe runs
Cold and hot supply lines routed to fixtures and tanks.

Ahmadi
Water pipe runs in Shuaiba serve both residential homes and industrial buildings and warehouses. We plan separate routes for fresh water and recycled water, and run pipes above salt-laden soil level. Pipes are pressure-tested at high values before handover because industrial use demands high reliability.
Shuaiba is an industrial zone and commercial port, and soil here is highly saline and close to the Gulf. Water pipes need dual corrosion protection, so we run plastic-wrapped or galvanised steel pipe. Shipping and unloading areas have high-value, heavily trafficked floors, so we route pipes above ground on isolated brackets for easy maintenance.
Shuaiba sits in Ahmadi governorate south of Ahmadi Town, an industrial coastal zone where salt corrosion threatens all metals.
Every welded joint is checked visually and by ultrasound because hidden joint failure in Shuaiba stops production.
Cold and hot supply lines routed to fixtures and tanks.
Leak located acoustically and by camera before any breaking.
Wrapping exposed or roof-level pipes against heat and condensation.
Removing mineral scale that narrows the pipe wall over time.
Targeted clearance of blocked supply lines without unnecessary breaking.
Internal camera pass and pressure check before pipes are concealed.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Pure copper corrodes fast in high salinity. We use plastic-wrapped copper or galvanised steel pipe instead. If the client insists on copper we wrap it in thick chemical insulation.
We use opaque pipe wrapped in metal or plastic insulation to block light. We add small vent ports to release trapped air and flush pipes with high-pressure water before handover.
