Roof-tank pump
Transfers water from ground tank to roof tank reliably.

Farwaniya
Water pump installation in Andalus requires understanding the distribution system for the dense area near Andalus Co-op. We test the existing well and set the right pump capacity based on its depth and water salinity. We house the pump in a sun-protected room and run cables carefully. We test pressure at the highest point in the neighbourhood before handing over.
Buildings in Andalus near the Fourth Ring Road were constructed around the same time and sometimes share the same well through a common distribution system. We inspect the shared valves and internal distribution before fitting a new pump, because one valve fault can affect several buildings. We identify where private ownership ends and shared responsibility begins to know which pump and pipe sections belong to each party.
Andalus is in Farwaniya governorate near Andalus Co-op and the Fourth Ring Road, a densely populated residential neighbourhood.
We test the pump cable insulation with a resistance meter because humidity reduces insulation fast in coastal-influenced areas.
Transfers water from ground tank to roof tank reliably.
Keeps hot water at the tap without a long wait.
Sets correct cut-in and cut-out points, stops short-cycling.
Evacuates cesspits efficiently with a non-return valve fitted.
Lifts sewage from low-level units to the drainage network.
Protects basements from water accumulation via float-activated switch.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Responsibility is usually shared by usage ratio or by a sharing agreement. Before any work we ask for the agreement to understand obligations, and we advise putting a separate valve for each building to clarify boundaries.
Very much so, saline water requires pumps with stainless steel corrosion-resistant parts. We measure water salinity with a probe before ordering, because picking a standard pump will shorten its lifespan dramatically.
