Pit inspection
Pit dimensions and condition checked before any pump is selected

Ahmadi
Basement sump pump installation in Ahmadi starts with lifting groundwater away from the foundation before it seeps into lower rooms. We measure pit depth and expected water volume, then select a pump sized for the actual load. We fit the float switch, run the discharge pipe clear of the building and test the pump under full water pressure.
Most older Ahmadi houses built near Ahmadi Co-op sit on low ground with aged collection pits beneath them that fill quickly during rainy season. The old pit is often shallow and wide with cracked walls, so we measure its diameter and the standing water level before fitting any equipment. The pump we choose must handle sand and silt carried by groundwater, because simple strainers are not enough in this area.
Ahmadi lies in Ahmadi governorate and contains the main headquarters of Kuwait Oil Company and heritage gardens ringed by high groundwater.
The pump is run immediately after installation to empty the pit completely and check float stability on every cycle.
Pit dimensions and condition checked before any pump is selected
Capacity matched to actual water ingress rate, not a generic size
Switch level set and float travel confirmed free inside the pit
Discharge direction verified and non-return valve fitted to stop backflow
Earthing and moisture-rated socket confirmed before the pump is powered
Pit filled manually and full run cycle confirmed before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We clear it by hand or vacuum pump before fitting the new pump. If the walls are too badly cracked, we recommend building a new lined pit beside it and connecting the pipes between them.
We run it at least five metres from the building into the street or open ground. If the street is low, we lay the line above ground with a gentle fall to prevent backflow at night.
