Pit inspection
Pit dimensions and condition checked before any pump is selected

Capital
The sump pump project in Jaber Al-Ahmad City focuses on new foundations built for large-scale development. Most houses have pits built-in, but need reliable pumps, floats and final discharge lines. We test each system under high-pressure water flow, then hand over a maintenance checklist before occupancy.
Foundations in Jaber Al-Ahmad City are deep and wide with pits pre-designed before concrete is poured. Basements here may reach three metres deep, and the discharge line must run far toward the main street or building drain. We measure pit perimeter and floor level, then pressure-test new discharge pipes before sealing.
Jaber Al-Ahmad City is a new residential development in Kuwait governorate where pre-cast pits provide a uniform base for pump installation.
Each new pump runs a thirty-minute test cycle under high-pressure water before handover to the family.
Pit dimensions and condition checked before any pump is selected
Capacity matched to actual water ingress rate, not a generic size
Switch level set and float travel confirmed free inside the pit
Discharge direction verified and non-return valve fitted to stop backflow
Earthing and moisture-rated socket confirmed before the pump is powered
Pit filled manually and full run cycle confirmed before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
The pit built into the structure is enough if it is at least one and a half metres deep with solid supports. We check concrete quality and for leaks, then test internal pipes before mounting the pump and float.
It goes to the building's main storm drain or the public rainwater system if available. We pressure-test the entire drain first to ensure no secondary pipes or sumps back up under full pump flow.
