Pit inspection
Pit dimensions and condition checked before any pump is selected

Jahra
Sump pump installation in Naeem starts by opening the old pit cover or digging a new pit if none exists. We measure the pit's inner dimensions and current groundwater level, then determine pump size and float position. We install pipes, connections and external drainage, testing full system operation before handover.
Newer houses in Naeem are built to better standards than older pits, and the sump pit is often already prepared but without a pump. We inspect the existing pit first and confirm its walls have not collapsed or the floor is not leaking sand. If it is sound we install the pump directly, but if damaged we rebuild it with concrete rated for sideways pressure.
Naeem is a relatively modern residential area in Jahra governorate, marked by improved planning and houses built on contemporary foundations.
We test the pump by discharge at least five hundred litres before signing off on completion.
Pit dimensions and condition checked before any pump is selected
Capacity matched to actual water ingress rate, not a generic size
Switch level set and float travel confirmed free inside the pit
Discharge direction verified and non-return valve fitted to stop backflow
Earthing and moisture-rated socket confirmed before the pump is powered
Pit filled manually and full run cycle confirmed before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, there is no other way to collect groundwater and seepage. We dig to half a metre below the foundation and test the water position before going deeper.
We avoid existing wires and pipes while digging and installing. However, a new power line must run from the fuse board with a separate switch and earth-leakage protection.
