Pit inspection
Pit dimensions and condition checked before any pump is selected

Ahmadi
Basement sump pump installation at Shuaiba Industrial begins with checking the collection pit under a warehouse or chemical plant floor. We measure pit depth and expected water flow, then select a pump sized for heavy industrial duty. We set high and low float switches precisely, run the discharge line to the main drain and test under full flow.
Industrial buildings at Shuaiba contain deep collection pits under warehouses and labs to receive seepage from processes and cooling systems. Large pits and high flow rates require pumps with heavy-duty motors and floats calibrated to very exact levels. We inspect both suction and discharge pipes for blockages before operation, because any restriction will cut pump performance under peak load.
Shuaiba Industrial sits in Ahmadi governorate and hosts a large industrial complex with petrochemical plants where moisture and seepage are constant.
The pump and floats are tested together under full pressure because failure of any part will flood the warehouse in hours.
Pit dimensions and condition checked before any pump is selected
Capacity matched to actual water ingress rate, not a generic size
Switch level set and float travel confirmed free inside the pit
Discharge direction verified and non-return valve fitted to stop backflow
Earthing and moisture-rated socket confirmed before the pump is powered
Pit filled manually and full run cycle confirmed before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We choose a three-phase submersible pump if the pit is deeper than 1.5 metres and expected flow is very high. A tall vertical float monitors level without freezing or mechanical failure during constant cycling.
Every three months in industrial areas because debris collects fast and clogs the strainer. We inspect the strainer monthly and remove any debris by hand before it reaches the pump.
