Pit inspection
Pit dimensions and condition checked before any pump is selected

Ahmadi
Sump pump installation at Zour starts by calculating water flow from cooling systems of turbines and power generators. We measure pit depth below the power plant floor and select a pump sized for continuous duty. We set multiple floats and test the entire line under maximum pressure before startup.
The power plant at Zour generates massive cooling water that seeps through motor and generator floors into a very deep central collection pit. These large pits need industrial-grade submersible pumps with three-phase motors and graduated floats that monitor continuous rise. We inspect suction pipes to ensure no air pockets because the pump loses efficiency if air enters the line.
Zour sits in Ahmadi governorate and hosts a power generation plant where high water flows and round-the-clock operation are constant.
We install an identical standby pump in an adjacent pit because failure of the only pump will shut down the plant in minutes.
Pit dimensions and condition checked before any pump is selected
Capacity matched to actual water ingress rate, not a generic size
Switch level set and float travel confirmed free inside the pit
Discharge direction verified and non-return valve fitted to stop backflow
Earthing and moisture-rated socket confirmed before the pump is powered
Pit filled manually and full run cycle confirmed before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, we install three floats: one to start at a set height, one to stop at a lower height and one for emergency alarm. Each float connects to a controller that manages motor start and stop without manual intervention.
The standby pump starts automatically when emergency level is reached by a third float. We install an alert that sends an instant message to maintenance so our crew arrives before the pit overflows and shuts the plant.