Current pump assessment
Checking amperage, pressure and mechanical condition before any decision

Capital
A cesspit pump in Rai serves a mixed commercial and residential zone with modern buildings and large shopping centres. We assess pit capacity based on daily peak use and drainage system load. We test the pump under high repeated loads before handover.
Rai buildings include residential towers, shops, restaurants and small warehouses, all connected to a central pit or parallel pits. The drainage load is very high especially during peak hours around hotels, malls and religious centres. The pit may receive thousands of litres per hour but surface area is limited. The pump must be high-powered and sustain continuous operation. We check the pipe network for blocks and cracks, and that power is stable with no interruptions.
Rai sits in Kuwait governorate and includes The Avenues Mall, IKEA and several commercial and residential centres.
We test the pump by running it at continuous flow for one hour to check performance stability and motor heat.
Checking amperage, pressure and mechanical condition before any decision
Sizing by pit volume, depth and discharge pipe diameter
Discharge line fitted with a non-return valve and sealed joints
Moisture-rated connection suited to a submerged cesspit environment
Float set to correct on and off levels to prevent dry running
Pit filled and a full pump cycle run before the technician leaves
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Pressure surge can happen if load is very irregular. We fit a relief valve at the pump discharge and a level controller that switches the pump on according to actual demand.
We calculate the current capacity and expected increase in volume. If the pit is insufficient, we can add a parallel pit or a second pump station with a shared level control system.
