Roof-tank pump
Transfers water from ground tank to roof tank reliably.

Capital
Pump installation in NW Sulaibikhat starts by inspecting the roof tank and existing pipework to match the right pump type. We test supply pressure from the mains and measure the distance from well or tank to all usage points. We mount the pump on a stable concrete base and fit isolation valves on inlet and outlet. It runs under full load with no vibration or leaks before we hand over.
Most NW Sulaibikhat houses have a private well under the foundation and a roof tank hanging above, with the pump moving water from well to tank for storage before distribution. We first inspect the inlet line from the well for air leaks that stop suction. Copper risers to the roof need steady fall and strong fixing because the weight of water high up strains the brackets. We clean and check the tank inside before the pump starts running.
NW Sulaibikhat lies in Kuwait governorate, an older residential area that relies on private wells because it sits far from the main water grid.
We run the pump from empty tank to full then monitor pressure for an hour because older houses often have hidden leaks inside the walls.
Transfers water from ground tank to roof tank reliably.
Keeps hot water at the tap without a long wait.
Sets correct cut-in and cut-out points, stops short-cycling.
Evacuates cesspits efficiently with a non-return valve fitted.
Lifts sewage from low-level units to the drainage network.
Protects basements from water accumulation via float-activated switch.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Vibration usually comes from a weak base or loose bolts under the roof. We remove the pump and repour a level concrete foundation with proper compaction underneath, then reinstall it with tight steel bolts.
Yes, every six months we check bearings, mechanical seal and electrical connections. Sand from the well sometimes seeps into the pump body so we clean filters and top up the bearing oil.
