Tank and line check
Tank size and pipe run checked before any pump is chosen

Hawalli
Roof tank pump installation in Anjafa starts by measuring tank volume and vertical distance. We choose the right pump, install it with a check valve and filters, and test pressure and flow on all floors.
Anjafa is a residential area of medium-sized apartment blocks and some small villas. Tanks are on roofs of varying heights, and some old pipes have internal stress from original construction. We precisely measure vertical distance from roof to first and ground floors, assess whether the existing tank is adequate or needs deep cleaning, and check pipe joints because new pump pressure may worsen old leaks.
Anjafa lies in Hawalli governorate, a residential area where nearly every building has a roof tank that now needs daily pumping.
Before final installation we test the check valve manually to verify maximum pump lift even with a full tank.
Tank size and pipe run checked before any pump is chosen
Type and capacity matched to actual tank height and demand
Pump seated on isolation pads to stop vibration reaching the structure
Inlet and discharge lines fitted with non-return and isolation valves
Outlet pressure measured and confirmed stable under normal fixture load
All joints inspected for leaks before the job is signed off
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
One building usually needs one strong pump to fill the tank in about an hour. If the building is very large or the tank huge, we may suggest a standby second pump with a manual switchover valve.
Modern pumps are quieter than old ones, but we recommend mounting on rubber pads to isolate vibration. Some Anjafa buildings need a protective enclosure around the pump to reduce noise if the roof is near residential units.
