Tank and line check
Tank size and pipe run checked before any pump is chosen

Farwaniya
Steady roof tank pumping in Ardhiya begins with assessing the tank and main lines. We select a pump matching the tank size and pressure required to supply houses and shops. The pump is mounted on an isolated base with safe electrical connection and tight water lines. Flow and pressure are tested by refilling the tank and verifying delivery to all demand points.
Ardhiya is near the industrial zone and contains residential homes, small workshops and shops in close quarters. This mix means the tank may serve routine household use plus higher demand from shops and workshops during working hours. We select a medium to high power pump and assess the pressure it can sustain at peak. Pipes are often run inside walls and floors to protect connections from exposure and damage.
Ardhiya sits in Farwaniya governorate near the industrial zone with mixed residential and commercial use.
The pump runs continuously for one hour at full pressure to calculate electricity use and confirm the metal casing does not overheat.
Tank size and pipe run checked before any pump is chosen
Type and capacity matched to actual tank height and demand
Pump seated on isolation pads to stop vibration reaching the structure
Inlet and discharge lines fitted with non-return and isolation valves
Outlet pressure measured and confirmed stable under normal fixture load
All joints inspected for leaks before the job is signed off
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Not necessarily, if the pump runs correctly and the tank is full. The mains line from the street may under-supply or the tank itself may be too small for demand. We monitor the tank refill rate from the street and its capacity, and measure peak pressure to pinpoint the cause.
Yes, but the roof location must safely bear the added weight and foundations must be reinforced. The current pump may need upgrading if the second tank sits higher or farther away. Intake and discharge lines are configured for each tank and pressure is tested with both operating.
