Tank and line check
Tank size and pipe run checked before any pump is chosen

Farwaniya
Roof tank pump installation in Khitan begins by inspecting the existing tank, old vertical risers and available natural pressure. We select a pump sized for the building height and occupancy, fit it on a vibration-dampening base and run full-load testing before release.
Most apartment blocks in Khitan were built in the 1970s and 80s with asbestos tanks, some with hairline cracks that leak slowly. We inspect the tank exterior for wet spots or discoloration and measure night-time water loss with no consumption. If leakage is significant we recommend replacing the tank before fitting a new pump, because the pump will simply drive water out through existing cracks.
Khitan sits in Farwaniya governorate near Farwaniya Hospital, a district of older residential apartment buildings.
We record tank water level before and one hour after the pump stops to detect hidden tank leakage.
Tank size and pipe run checked before any pump is chosen
Type and capacity matched to actual tank height and demand
Pump seated on isolation pads to stop vibration reaching the structure
Inlet and discharge lines fitted with non-return and isolation valves
Outlet pressure measured and confirmed stable under normal fixture load
All joints inspected for leaks before the job is signed off
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Temporary patching works for hairline cracks only, but will not withstand pump pressure long. Old asbestos tanks crumble quickly under vibration, so replacement is the permanent solution.
The pump provides steady pressure, but the cold comes from the well water itself which is naturally cool. We add insulation to the suction pipes if cooling is too rapid, but a complete solution needs a separate water heater.
