Tank and line check
Tank size and pipe run checked before any pump is chosen

Hawalli
Roof tank pump installation in Ministries Area begins with checking the existing tank, main supply line and available pressure. We select the pump suited to tank size and building height, secure it firmly to the floor and test full flow before handover.
Government buildings and offices around the Ministries Complex need steady pumping because roof tanks rely on natural pressure alone at peak hours. We inspect the tank location on the roof, its height above the highest outlet and the distance between them. If the tank is remote or pressure drops, we fit a pump with a delivery line and an automatic on-off control valve.
Ministries Area lies in Hawalli governorate, where government buildings and administrative offices cluster at high density.
Pump pressure is tested with a gauge on the main line because excess pressure causes leaks at distant joints.
Tank size and pipe run checked before any pump is chosen
Type and capacity matched to actual tank height and demand
Pump seated on isolation pads to stop vibration reaching the structure
Inlet and discharge lines fitted with non-return and isolation valves
Outlet pressure measured and confirmed stable under normal fixture load
All joints inspected for leaks before the job is signed off
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, the suction line and filter are checked every three months and oil is changed per manufacturer guidance. A dry-running pump operating under high pressure wears faster if incoming water from the tank is not inspected.
If power cuts, the pump stops and buildings rely on water remaining in the roof tank until power returns. Water cannot be pumped manually from a roof tank, but some offices install a backup ground tank with a second pump.
