Tank and line check
Tank size and pipe run checked before any pump is chosen

Capital
Roof tank pumping in Sawaber depends on lifting water to shared tanks on the roofs of tall residential towers. We check mains pressure and the rising main that penetrates dozens of floors, choose a pump powerful enough to overcome high resistance, then secure it firmly to a fixed base.
Residential towers in Sawaber Complex connect their tanks with thick copper or metal pipes that run the full height of the building. These pipes endure vibration from plumbing activity in flats and often leak at joints halfway up the tower. We climb to the roof and inspect the pipe from top to bottom for any drip or kink reducing flow. Before fitting a new pump we flush the entire line with high-pressure water and re-tighten every joint with correct safety clamps.
Sawaber is a modern residential complex in Kuwait City with tall towers and multi-storey flats, and its tanks need very powerful pumps.
Before handing over a pump in Sawaber we run a full-load test for three continuous hours because tall towers tolerate only completely reliable pumps.
Tank size and pipe run checked before any pump is chosen
Type and capacity matched to actual tank height and demand
Pump seated on isolation pads to stop vibration reaching the structure
Inlet and discharge lines fitted with non-return and isolation valves
Outlet pressure measured and confirmed stable under normal fixture load
All joints inspected for leaks before the job is signed off
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Usually because the pump is too weak to overcome the high pressure in the long pipe, or because the line is partly blocked by scale. We measure pressure at the pump outlet and midway up the tower to diagnose the problem precisely then select a stronger pump if needed.
Yes, pipes rising more than twenty metres need at least one air release valve midway and another on the roof. This prevents air trapping which greatly reduces flow and causes banging sounds in the pipes.
