Line camera check
Camera films the drain before work begins to rule out blockage or fracture

Mubarak Al-Kabeer
Sewage pumping at Abu Hasaniya serves large villas with multiple bathrooms, luxury kitchens and complex water networks. We check supply lines from each floor and bathroom and measure how grey and black water flows before choosing a pump with sufficient vertical head. We install the unit in a secure chamber, fit level floats and run a full discharge test.
Abu Hasaniya seafront villas sit on deep foundations in mixed sandy soil with rock, and their waste tanks often lie below street level. Waste lines from bathrooms and kitchens flow gently toward the collection sump, and in hot season sediment builds quickly. A pump with sensors maintains steady suction and blocks heavy silt blockages.
Abu Hasaniya sits in Mubarak Al-Kabeer governorate overlooking the sea, where upscale villas need reliable sewage pumping systems.
We check sump depth below street level before pump selection, because the coastal environment affects required lift pressure.
Camera films the drain before work begins to rule out blockage or fracture
Capacity matched to the sewage load and the discharge pipe length
Pump installed with a non-return valve and fully sealed pipe connections
Moisture-rated cable routed clear of standing effluent and secured properly
Operating level set to prevent overflow and protect the pump from dry running
Pump run under real flow before handover to confirm correct discharge
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, so we install air dehumidifiers in the pump chamber and choose corrosion-protected units with salt-resistant seals. Monthly discharge tests reveal any early wear.
We recommend a fibreglass or reinforced plastic tank over concrete, as it resists salt corrosion better. Annual internal inspection confirms tank wall condition.
