Line camera check
Camera films the drain before work begins to rule out blockage or fracture

Ahmadi
Sewage pump installation at Ahmadi Stables begins with assessing the main collection tank that gathers discharge from multiple buildings and facilities across the site. We trace the incoming lines from each structure and measure daily flow volume before selecting the right pump. We fit the pump in a protective chamber, install level floats and rising pipe, then run the system under full load.
Equestrian stables and facilities at Ahmadi include stalls, rider bathrooms, feed stores and multiple waste lines draining to a central sump. The sandy soil drains quickly, but the collection tank can fill fast during peak activity season and competitions. We need a pump with enough vertical head to discharge to the municipal sewer line that is some distance from the site.
Ahmadi Stables lie in Ahmadi governorate, a specialized equestrian zone where repeated sewage pumping is needed for consistent waste drainage.
We measure single-line discharge in one minute before sizing the pump, because smaller lines affect unit selection.
Camera films the drain before work begins to rule out blockage or fracture
Capacity matched to the sewage load and the discharge pipe length
Pump installed with a non-return valve and fully sealed pipe connections
Moisture-rated cable routed clear of standing effluent and secured properly
Operating level set to prevent overflow and protect the pump from dry running
Pump run under real flow before handover to confirm correct discharge
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
That depends on animal count, daily cleaning schedules and event days. We monitor the tank over a full week to learn the real pattern before setting the level sensors.
We select a pump with higher head and greater capacity based on our measurements. If seasonal spikes emerge, we add an alarm sensor to alert you before the tank overfills.
