Line camera check
Camera films the drain before work begins to rule out blockage or fracture

Jahra
Sewage pumps in Jahra Industrial serve feed mills, fuel and paint plants with heavy waste flows and contaminated water. We inspect heavy drain lines and large sumps, select a powerful modern pump and install filters and separator tanks before it.
Jahra Industrial plants produce waste containing solids, oils and mild acids. Their sumps are large but pipes clog frequently. We mount a metal screen at the sump inlet and an oil separator tank before the pump to capture oils, extending motor and impeller life. The line from sump to main collection point is usually long, so we select a pump with high lift capacity.
Jahra Industrial lies in Jahra governorate and holds diverse heavy plants requiring robust sewage pumps and intensive maintenance.
We inspect the inlet screen and impeller weekly in summer because higher summer flow raises the risk of rapid clogging.
Camera films the drain before work begins to rule out blockage or fracture
Capacity matched to the sewage load and the discharge pipe length
Pump installed with a non-return valve and fully sealed pipe connections
Moisture-rated cable routed clear of standing effluent and secured properly
Operating level set to prevent overflow and protect the pump from dry running
Pump run under real flow before handover to confirm correct discharge
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
The pump can handle it, but without an oil separator first it clogs in a week. We install a separator tank that traps oil and grease before the pump, keeping the impeller cleaner longer.
We install an overflow alarm that alerts the plant an hour before spill. If flow is consistently higher we replace the pump with a stronger model or add a second pump in parallel.
