Line camera check
Camera films the drain before work begins to rule out blockage or fracture

Ahmadi
Sewage pump installation at Mina Abdullah starts by checking drain pipes buried beneath port wharves and warehouses. We measure line depth and internal pressure, then select a pump that handles the high load from maritime operations. We fit the pump and direct water to the marine outfall or main tank.
Mina Abdullah buildings sit close to the shoreline and include cargo terminals, warehouses and admin offices. Drain lines here are mixed: some carry heavy industrial water from oil stations, others carry greywater from restrooms and canteens. We test water quality first because heavy discharge needs larger pump impellers and pre-filtration before pumping.
Mina Abdullah sits in Ahmadi governorate, a major oil port where petroleum wells and storage tanks stand alongside coastal facilities.
We run the pump on actual tank water for an hour before handover because marine salt air affects performance.
Camera films the drain before work begins to rule out blockage or fracture
Capacity matched to the sewage load and the discharge pipe length
Pump installed with a non-return valve and fully sealed pipe connections
Moisture-rated cable routed clear of standing effluent and secured properly
Operating level set to prevent overflow and protect the pump from dry running
Pump run under real flow before handover to confirm correct discharge
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
No, heavy discharge needs a pump with a larger impeller and corrosion-resistant casing. We choose a centrifugal pump instead of a standard submersible and fit a pre-filter to remove larger particles.
We use a line-inspection camera first to see where the blockage sits. If it is severe we jet the line with high-pressure water or excavate the joint and clean it manually, then fit the pump after full clearing.
