Line camera check
Camera films the drain before work begins to rule out blockage or fracture

Capital
Sewage pump installation in Sharq usually follows a change of use, as basements in older commercial buildings near Sharq Marina become cafes, gyms and offices. New toilets and sinks below street level need a reliable way out, and we fit the lifting unit to suit the new tenant.
Between Kuwait Towers and the NBK Head Office, a basement fit out often has to work around columns, existing ducts and a landlord who wants no structural cutting. Surface mounted lifting stations sit on the finished floor inside a sealed tank, so no pit has to be broken into the slab. We route the discharge through the existing service shaft to the building's gravity stack and leave an isolation valve for future maintenance.
Sharq is the capital's waterfront business district between Kuwait Towers and Sharq Marina, with many older commercial buildings.
Surface mounted lifting stations need no pit in the slab, which suits leased basements where cutting is not allowed.
Camera films the drain before work begins to rule out blockage or fracture
Capacity matched to the sewage load and the discharge pipe length
Pump installed with a non-return valve and fully sealed pipe connections
Moisture-rated cable routed clear of standing effluent and secured properly
Operating level set to prevent overflow and protect the pump from dry running
Pump run under real flow before handover to confirm correct discharge
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, because the discharge connects to the building's shared stack. We prepare a short description of the unit and its route that you can pass to the landlord.
A surface mounted station can be disconnected and taken out, leaving only capped pipes. That is one reason tenants often prefer it to a built in pit.
