Line camera check
Camera films the drain before work begins to rule out blockage or fracture

Capital
The right sewage pump in Shuwaikh begins by checking the condition of the rising main under the industrial roads. Pumps here work at high pressure because the distance from the factory to the collection point is long. We measure line resistance with a pressure gauge and choose a pump powerful enough to lift liquid across a long run in summer heat.
Shuwaikh industrial buildings and warehouses need reliable drainage because pump failure stops production. The rocky soil here makes digging a new deep pit expensive, so enlarging the existing pit and deepening its floor is cheaper. We test the stone pit walls for cracks and seepage, and clear stone silt from the suction line before the pump.
Shuwaikh sits in Kuwait City between Shuwaikh Port and the Kuwait Science Museum, an industrial zone where the long rising main and continuous pumping form the basis of drainage.
We test the discharge line under actual working pressure with the pump running for thirty continuous minutes before final handover.
Camera films the drain before work begins to rule out blockage or fracture
Capacity matched to the sewage load and the discharge pipe length
Pump installed with a non-return valve and fully sealed pipe connections
Moisture-rated cable routed clear of standing effluent and secured properly
Operating level set to prevent overflow and protect the pump from dry running
Pump run under real flow before handover to confirm correct discharge
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but the pit and rising main must be sized from the start to handle two pumps. If the pit is too small, adding a second pump forces each one to overwork.
One valve on the suction side and two on the discharge side, one right after the pump and one at the exit point. This lets you repair any section without refilling the entire pit.
