Line camera check
Camera films the drain before work begins to rule out blockage or fracture

Jahra
Sewage pumps in Taima move wastewater from scattered houses across the desert to distant municipal lines. We measure distance and height, then pick a pump built for long-distance lifting without stalling.
Taima houses sit on the Jahra desert edge where the main network is very distant, sometimes 500 metres away. This long run needs a stronger pump and wider pipes to cut loss. Pipes exposed across open desert get clogged fast by sand and dust, so we fit inspection covers every 50 metres. We test the pump under the harshest conditions because a breakdown means total sewage stoppage and repair is hard in a remote location.
Taima is a desert zone in Jahra governorate far from urban networks, where sewage lines are exceptionally long.
Before handover we run the pump at full flow for two hours to confirm it does not stall or overheat in desert conditions.
Camera films the drain before work begins to rule out blockage or fracture
Capacity matched to the sewage load and the discharge pipe length
Pump installed with a non-return valve and fully sealed pipe connections
Moisture-rated cable routed clear of standing effluent and secured properly
Operating level set to prevent overflow and protect the pump from dry running
Pump run under real flow before handover to confirm correct discharge
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Every three months minimum, especially after sandstorms. We open inspection covers and push a high-pressure water jet through. If you skip this, the pipes will clog completely within one season.
Yes, a strong pump needs a larger motor so uses 1.5 to 2.2 kilowatts depending on load. But this is the price of lifting 500 metres. We choose a high-efficiency motor to cut consumption as much as possible.
