Transfers water from ground tank to roof tank reliably.

Ahmadi
Pump installation in Shuaiba Industrial differs from residential because consumption is higher and pressure demand is stronger. We inspect massive collection tanks and main distribution lines to various facilities. We size the pump based on desired flow rate and total lift height. We fit steel pipes instead of copper and install pressure relief valves to protect lines from overpressure.
Industrial facilities in Shuaiba need robust horizontal pumps handling continuous high pressure, with tanks built from reinforced concrete underground or on tall columns. Main lines are very long, running between different production wings, so we calculate pressure drop per hundred metres. Dust and salt from sea air clog strainers fast, so we fit large easy-clean strainers at the line start. We test pressure at multiple points across the network.
Shuaiba Industrial sits in Ahmadi governorate near the Aramco and KIPIC complex, an area confined by dense industrial activity and heavy water services demand.
We pressure-test steel pipes and joints for three days steady before full operation because even a small leak causes emergency downtime.
Transfers water from ground tank to roof tank reliably.
Keeps hot water at the tap without a long wait.
Sets correct cut-in and cut-out points, stops short-cycling.
Evacuates cesspits efficiently with a non-return valve fitted.
Lifts sewage from low-level units to the drainage network.
Protects basements from water accumulation via float-activated switch.
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We install a relief valve right after the pump that opens automatically when set pressure is exceeded and returns excess water to the tank. We select a setting that protects lines and equipment from burst.
Usually no, because long new pipes significantly increase pressure loss. We calculate proper pipe diameter and measure pressure at line end, and may need a stronger pump or add a second one.