Roof tank installation
Polyethylene tank set on roof with supply, overflow and pump lines connected

Ahmadi
Water tank installation in Fahad Al-Ahmad starts by lifting the underground or roof tank into its final position according to the house layout. We measure the pipe runs from the inlet pump to every distribution point on each floor and test the pressure before handover.
Fahad Al-Ahmad houses are typically two or three storeys with a roof tank above the majlis or rear roof section. We check the roof structure first to calculate the weight of a full tank, then run supply pipes from the tank to each floor with isolation valves at every connection. An underground tank in the rear courtyard needs a pump to lift water to the roof, and we size the pipe and pump by the building height and number of outlets.
Fahad Al-Ahmad sits in Ahmadi governorate, a residential suburb where detached family homes are the standard setting for tank installation.
Before finishing, the tank runs at full capacity and the water level is watched for one hour because any leak will show on the adjoining floor or wall.
Polyethylene tank set on roof with supply, overflow and pump lines connected
Watertight underground tank built with access hatches and rising main connected
Mains supply connected to tank with float valve and isolation fitted
Overflow routed away from the building at correct fall to prevent backflow
Transfer or pressure pump connected to tank and tested under load
Full network pressure test after installation confirms every joint holds
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
It depends on the tank position on the roof and the building levels, usually between three and five metres. We calculate the exact height and test the pressure at the lowest tap to confirm adequate flow force.
Yes, the underground tank stores network water and the pump lifts it to the roof tank which distributes it by gravity. We fit a check valve after the pump to stop water flowing back at night.