Roof tank installation
Polyethylene tank set on roof with supply, overflow and pump lines connected

Ahmadi
Water tank installation in Jaber Al-Ali requires choosing a safe roof position away from power cables and aerials. We set a concrete base for the tank, connect the inlet and outlet pipes and test every joint under high pressure.
Jaber Al-Ali houses are engineered designs with flat roofs and clear boundaries between adjoining properties. The roof tank typically sits in the north-east corner to avoid direct sun and reduce algae growth. We run vent pipes from the tank air valve to the roof gutter and fit an overflow valve to stop excess water leakage. An underground tank, if present, sits under the front or rear yard with an access cover that is easy to reach for annual cleaning.
Jaber Al-Ali lies in Ahmadi governorate, where ordered planning and modern construction make tank installation straightforward and precise.
Every threaded and welded joint is tested with a mixed air and water pump for twenty minutes because high roofs endure constant structural movement.
Polyethylene tank set on roof with supply, overflow and pump lines connected
Watertight underground tank built with access hatches and rising main connected
Mains supply connected to tank with float valve and isolation fitted
Overflow routed away from the building at correct fall to prevent backflow
Transfer or pressure pump connected to tank and tested under load
Full network pressure test after installation confirms every joint holds
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We inspect the roof first by its age and concrete condition, and if there are cracks or dampness we suggest reinforcement with steel props. A full tank weighs up to three tonnes so reinforcement is essential.
At least once in spring before hot weather, and if you notice colour or smell in the water immediate cleaning is needed. We remove sediment from the bottom and inspect the valves and pipes from inside.
