Roof tank installation
Polyethylene tank set on roof with supply, overflow and pump lines connected

Capital
Water tanks in Mirqab serve older residential towers where water must reach ten storeys or more with steady pressure. We select a large tank or twin tanks and fix them carefully on tight roofs, then install powerful pumps to lift water.
Mirqab residential towers were built decades ago with tight roofs and original structures fatigued by heavy loads. Near Mirqab Mall and Grand Mosque we work on old tanks we replace with new ones while rerouting supply runs. We test old pipes before reuse and fit new check valves on each branch for easier maintenance later.
Mirqab sits in Kuwait governorate, an older residential district where most buildings are tall apartment blocks relying on rooftop tanks.
Every pump is pressure-tested after installation because tall towers need at least four bars minimum.
Polyethylene tank set on roof with supply, overflow and pump lines connected
Watertight underground tank built with access hatches and rising main connected
Mains supply connected to tank with float valve and isolation fitted
Overflow routed away from the building at correct fall to prevent backflow
Transfer or pressure pump connected to tank and tested under load
Full network pressure test after installation confirms every joint holds
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, if the roof can fit two steel frames. We split supply lines between tanks so each works independently, making maintenance and cleaning easier.
At least once before summer. We shut off the supply, drain the tank and sweep out internal sediment, then test pipes before restart.
