Roof tank installation
Polyethylene tank set on roof with supply, overflow and pump lines connected

Jahra
Water tank installation in Mutlaa is done on rocky foundations and hard soil typical of elevated areas. We size the tank according to local demand and distance from the water source. We clear or prepare the setting point and build a solid concrete base. Supply pipes are run with rust protection and pressure-tested before completion.
Mutlaa is a topographic ridge with hard rocky soil and thin topsoil, making deep digging difficult and costly. Instead the tank sits on surface on a strong flat concrete base. Strong ridge winds require extra fixing with bracketing or tie-down bolts. Supply from the municipal pump station or well needs heavy screening because wind carries sand and dust. Overflow and flushing drain naturally toward surrounding wadis.
Mutlaa lies in Jahra governorate, a rugged elevated area dominated by rock, sandy soil and striking desert landscape.
Tank-to-base fastening is tested with a 50-kilogram horizontal pull before filling because Mutlaa winds exploit any weak point.
Polyethylene tank set on roof with supply, overflow and pump lines connected
Watertight underground tank built with access hatches and rising main connected
Mains supply connected to tank with float valve and isolation fitted
Overflow routed away from the building at correct fall to prevent backflow
Transfer or pressure pump connected to tank and tested under load
Full network pressure test after installation confirms every joint holds
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes if properly fixed. We use deep anchor bolts in the concrete base and metal bracing around the tank. Horizontal pull-strength is tested before filling.
Yes, so an air filter and sand trap are fitted before the supply pipe. Water clarity is checked on first fill to confirm filter adequacy.