Roof tank installation
Polyethylene tank set on roof with supply, overflow and pump lines connected

Capital
Tank installation in Qortuba starts by lifting the tank to the roof or burying it underground based on the villa's design. We connect the supply from the meter, fit the lift pump, check pressure and flow, then test everything before handover.
Villas in Qortuba need large-capacity tanks because families in this area use plenty of water, and tanks are usually roof-mounted since the villas are tall. We choose a safe roof position away from direct sun and leaks, run the supply from the meter tap and install a powerful lift pump to feed all floors. Before finishing, we fill the tank, run the pump and confirm water reaches the highest points with steady pressure.
Qortuba lies in Kuwait governorate, an upscale villa zone with high roofs that demand powerful pumps and long distribution pipelines.
Every joint in the supply and return line is tested under high pressure before handover because a small leak on a high roof is hard to repair later.
Polyethylene tank set on roof with supply, overflow and pump lines connected
Watertight underground tank built with access hatches and rising main connected
Mains supply connected to tank with float valve and isolation fitted
Overflow routed away from the building at correct fall to prevent backflow
Transfer or pressure pump connected to tank and tested under load
Full network pressure test after installation confirms every joint holds
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Each has benefits depending on the villa's structure. A roof tank gives natural pressure without an extra pump, but needs heat insulation. An underground tank saves roof space but needs a strong lift pump.
We test three times: first by filling the tank and checking all joints for leaks, second by running the pump and reading pressure at the gauge, third by opening taps on every floor to confirm even flow.