Tank installation
Mounting the tank on a level concrete base to protect its base from cracking

Capital
Roof tank installation in Sharq has to keep out the pigeons and gulls that gather on rooftops near Sharq Marina. An unscreened vent or loose lid lets droppings and feathers into the water, so every tank gets a locking lid, fine mesh on its vent and a flap on its overflow.
On a Sharq office roof the tanks often sit beside plant rooms and cooling towers where birds roost in the shade. An overflow pipe left open is an easy way in for small birds, and a lid that simply rests in place can be lifted by wind. We fit screw-down or locking lids with gaskets, stainless mesh over vent caps, and hinged flaps on overflow ends, then check nothing on the roof gives birds a perch directly above an opening.
Sharq, between Kuwait Towers and Sharq Marina, has office and residential towers whose rooftops attract roosting birds from the waterfront.
An open overflow pipe on a roof tank is one of the easiest ways for small birds to get inside.
Mounting the tank on a level concrete base to protect its base from cracking
Running the fill line and distribution line to floors in PPR pipe
Installing the overflow at correct slope so no water pools on the roof
Connecting the existing transfer or pressure pump and setting its switch
Fitting a brass float valve sized to the tank for accurate fill cut-off
Testing all joints under pressure before handover to confirm no leaks
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Usually through an open overflow, an unscreened vent or a lid that is not secured. After cleaning and disinfection, each opening is screened or sealed.
It keeps wind and birds out and stops anyone opening the tank without the building's knowledge, which matters on a shared roof.
