Roof tank installation
Polyethylene tank set on roof with supply, overflow and pump lines connected

Jahra
Water tank installation in Sulaibiya starts by checking the mains pressure and household size. We choose the right tank for roof or underground mounting, run supply and distribution pipes, connect a pressure pump if needed and test every joint and valve before handover.
Houses scattered across Sulaibiya rely on roof tanks to store water because mains supply can drop during peak summer hours. We hoist the new tank onto the steel frame and inspect the foundation and bracket security before bolting it tight. Then we run the feed pipe from the vertical riser beside the staircase, and every run must slope steadily toward the tank.
Sulaibiya sits in Jahra governorate, a residential pocket in desert land where families must rely on water storage.
We fill the new tank to capacity and leave it standing for two hours to check for leaks around the base and every connection.
Polyethylene tank set on roof with supply, overflow and pump lines connected
Watertight underground tank built with access hatches and rising main connected
Mains supply connected to tank with float valve and isolation fitted
Overflow routed away from the building at correct fall to prevent backflow
Transfer or pressure pump connected to tank and tested under load
Full network pressure test after installation confirms every joint holds
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
The tank must rise high enough to give adequate pressure throughout all distribution pipes in the house. We calculate the height based on the number of floors and tank capacity.
Yes, we drain the old tank completely and disconnect all joints and bolts, then lift it using hoisting equipment. The roof is cleaned of debris and sediment before the new frame is bolted down.
