Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Hawalli
An underground tank in Hawalli Midan serves shops and offices in the old commercial strip where digging must respect existing underground infrastructure and busy streets above. We first check old water and sewer lines, dig carefully, build uniform concrete walls and test thoroughly before handover.
Hawalli Midan has small shops and old office buildings packed closely together, with underground space crowded by water lines, sewers and electric cables. Before starting we request infrastructure maps from the municipality and dig carefully to avoid cutting old pipes or cables. We build the tank with thick walls to handle vibration from traffic above, and fit protected access covers and vent valves shielded from dust and exhaust.
Hawalli Midan sits in Hawalli governorate in the heart of an old commercial district with narrow streets and dense building.
Every concrete joint and opening is tested by high-pressure water pumping for at least six hours before tank approval.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We request exact maps from the municipality and dig by hand tools in sensitive areas. Pipes are exposed first then dug around carefully. If we find a damaged line we notify utilities and the municipality immediately before continuing.
We build thicker walls in busy commercial zones to absorb vibration. High-pressure testing for extended periods simulates daily vibration and confirms no new leaks appear.