Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Jahra
Sandy ground around New Jahra makes underground tank construction a question of stable sides and a firm base. We cut the excavation back to a safe slope or shore it, compact the bottom in layers and cast a level blinding slab before any steel is placed.
Loose sand between Jahra Mall and Jahra Hospital runs back into an open hole, especially after wind or a watering of the site, and a base laid on disturbed sand can settle unevenly and crack the tank. We remove soft material, compact the formation with a plate compactor, check the level across the whole footprint, and protect the finished excavation from blown sand with covers until the base is poured.
New Jahra is an inland Jahra residential area around New Jahra Co-op, built largely on loose, sandy ground.
The excavation base is compacted and levelled across the full footprint before the blinding layer is cast.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We cover the hole and stop work until it passes, then clear any sand that blew in before continuing. The base is never cast on wind blown material.
A crack running across the base often points to uneven support underneath. We inspect it and advise whether it can be sealed or the tank needs rebuilding on a properly compacted base.