Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Capital
Building an underground tank in Qortuba starts with deep excavation beneath the villa to store drinking and household water. We construct reinforced concrete walls at proper thickness, apply waterproof membranes and test for leaks before backfilling.
Qortuba villas need large underground tanks because mains pressure does not reach all floors of the house. We choose the excavation site away from existing foundations and pipes, often positioning the tank under a side courtyard. We measure the height difference between the tank top and the highest water point in the house to ensure adequate pressure without extra pumps.
Qortuba in Kuwait governorate is an upscale villa area with spacious plots where a deep underground tank is the standard solution for secure water storage.
Every finished tank is tested full and left static for eight hours to detect any seepage in the walls or floor.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We apply waterproof membranes to all interior and exterior surfaces before and after concrete casting. We test under full water pressure and treat any hairline cracks before handover.
Very much so. A deep tank under the courtyard gives good height difference for upper floors. A shallow position may need a pump pushing to a roof tank to reach higher levels.