العربية Call now

Hawalli

Underground tank construction in Shaab

Digging an underground tank in Shaab faces an extra challenge: groundwater sits high because of coastal proximity. We select a safe spot, build temporary retaining walls, construct the tank with a raised floor and seal it thoroughly.

  • 24-hour emergency
  • Camera first, every job
  • Leak detection without breaking
  • All six governorates

What sets this area apart

Houses overlooking Sha'ab Park and Sha'ab Leisure Park sit on relatively low ground where groundwater rises close to the surface. When excavating we hit moisture and wet sand, so we raise the tank floor above groundwater level and add a drainage membrane around the outer walls. The soil here is sensitive so we pressure-test the walls before backfilling.

Shaab is in Hawalli governorate near the coast, a district where underground tank design must account for high groundwater levels.

We bore a test sample at three metres depth before excavation begins to pinpoint the groundwater table precisely.

What the job covers

Site and depth planning

Position and depth chosen to suit the transfer pump and surface loads

Walls and base construction

Base and walls built to carry soil pressure and full water load

Full waterproof lining

Internal and external coating layers that block water movement in both directions

Pipe entry points

Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks

Pump and float connection

Transfer pump and water-level float wired and adjusted for correct operation

Tightness test

Tank filled and water level watched to confirm zero leakage before backfilling

How we work

Our four steps, and you see every one

Illustration of a phone with a speech bubble showing a drain grate
01

You call and describe it

Tell us what is happening and where, and the right equipment is loaded before we arrive.

Illustration of a drain camera reel and monitor at a floor drain
02

The camera goes down

We film the line from inside and know the kind of blockage and its exact place. No guessing.

Illustration of a jetting nozzle spraying into a drain opening
03

We clear it

High pressure water, a machine or a drain snake, whichever the line actually needs.

Illustration of a monitor on a tripod showing a clear line with a tick
04

We film it again

The camera runs a second pass and you see the line clear with your own eyes before we leave.

Who we work for

Same method, same equipment. Only the size of the job changes.

A clean modern bathroom with grey stone tiling

Homes and apartments

  • Drain and gully unclogging
  • Cesspit suction
  • Leak detection without breaking
  • Tank cleaning and waterproofing
A modern office washroom with wall hung basins

Offices

  • Plumbing maintenance contracts
  • Mixer and valve repair
  • Low water pressure
  • Clearing bathroom lines
A stainless steel commercial kitchen with a floor channel drain

Restaurants

  • Grease traps
  • Commercial kitchen lines
  • Restaurant gas lines
  • Scheduled clearing and cleaning
A basement plant room with pumps and neat pipework

Complexes and buildings

  • Sewer network maintenance
  • Sewage and basement sump pumps
  • Manhole and inspection chamber cleaning
  • Operation and maintenance contracts

Why us

Why Al Amana

Amana means trust. Someone else's home is not ours to be careless in.

  • Filmed before and after

    Do not take our word for it. Look at the line yourself.

  • Clearing before breaking

    Breaking is the last resort, never the first step.

  • 24-hour emergency

    A blocked line does not wait for the morning.

  • All of Kuwait

    Six governorates, 139 areas.

  • Maintenance contracts

    For buildings and complexes, servicing before the problem starts.

  • We work on commercial sites too

    Restaurants, offices and complexes, not only homes.

More areas for Underground tank construction

Back to Underground tank construction

Other services in Shaab

Common questions

Questions about Underground tank construction in Shaab

Need someone now? The emergency line is open any hour.
+965 9668 4964

Does high groundwater affect tank durability?

Not if sealed properly, but the tank must sit above the groundwater level with a safety margin. We add a drainage layer and conduct full hydrostatic pressure testing before handover.

How deep can we safely dig in Shaab?

Usually three metres below surface before hitting high moisture. If you want deeper, we use thicker concrete walls and run a continuous drain pump during construction.

A quiet Kuwaiti residential street with a drain cover in the pavement

Need this now?

Tell us what is happening, and the right equipment is on the van before we set off.

Call now WhatsApp