Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Jahra
Underground tank construction in South Jahra starts with removing sandy soil and levelling the pit floor with care. We build reinforced concrete walls at consistent thickness, seal them with bitumen and pressure-test the full tank before final connection.
South Jahra villas are mostly older on large plots, and underground tanks there need deep excavation because groundwater levels are high in this area. We begin by removing sandy soil with machinery then inspect the pit base to ensure it is solid before concrete pouring. Where the ground is wet we lay graded gravel foundation under the walls to drain water away from the tank during early stages.
South Jahra is a residential area in Jahra governorate where independent villas rely on underground tanks for water storage.
Each tank undergoes full-pressure water test for six hours to confirm no seepage at joints or walls.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Depth depends on groundwater level and available yard space. We first sample the soil to locate groundwater, then calculate depth so the tank base sits at least one metre below that level.
Yes, so we build thick reinforced walls and seal them with exterior bitumen. If groundwater is very close we install drainage around the tank to reduce external pressure.