Site and depth planning
Position and depth chosen to suit the transfer pump and surface loads

Jahra
Underground tank construction in Uyoun starts with deep digging in wet springland soil where the base must be sealed hard against groundwater seep. We choose the dig site away from main sewerage lines, pour reinforced concrete walls and lay a waterproof membrane before filling and testing the tank.
Uyoun has old septic pits and shallow artesian wells nearby, meaning digging requires care to avoid cutting any existing water line. We test the groundwater level and set dig depth so the tank base sits above the permanent water table, because a weak seal lets water push up from below. Where groundwater runs high we fit roof venting and support the pit walls from outside with vertical drainage pipes.
Uyoun lies in Jahra governorate and is known for natural water springs, which makes underground tank building there different from drier areas.
Every tank is tested by water injection for twenty-four hours before handover because wet soil quickly shows any small leak.
Position and depth chosen to suit the transfer pump and surface loads
Base and walls built to carry soil pressure and full water load
Internal and external coating layers that block water movement in both directions
Inlet and outlet openings sealed with rubber collars to prevent pipe-joint leaks
Transfer pump and water-level float wired and adjusted for correct operation
Tank filled and water level watched to confirm zero leakage before backfilling
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We install a temporary dewatering pump around the pit to lower the water level before building. This lets us lay the seal and pour concrete without water seeping from below.
Yes, fine sand in Uyoun cannot bear weight alone, so we use steel mesh in walls and base together. This prevents cracking when the tank fills.
