Site and capacity survey
bathroom count and available pressure assessed before any unit is chosen

Farwaniya
The central heater in Abdullah Mubarak requires careful planning because most villas have bathrooms spread across multiple storeys. We install the unit efficiently and then run the heating loop with insulated pipes to minimise heat loss over long runs.
Villas near Abdullah Mubarak Co-op are often built on large plots with a main bathroom on the first floor, a ground-floor guest bathroom and an upper bathroom. The horizontal distances between them mean long pipes and significant heat loss without insulation. We position the unit close to the ground well for reliable supply and run copper pipes under thick foam insulation.
Abdullah Mubarak suburb lies in Farwaniya governorate on the Sixth Ring Road, where large residential villas predominate.
Before firing the heater we flush the loop under high pressure to purge solder residue from inside the pipes.
bathroom count and available pressure assessed before any unit is chosen
tank secured on brackets rated for full operating weight
supply and return lines run at correct fall to prevent stagnation
gas or electrical feed connected with ventilation confirmed before start-up
expansion valve and drain-off valve fitted as standard safety requirements
every joint checked for leaks under pressure before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
It will take longer because cold water in the long horizontal pipes must first drain away. We fit a thermostatic mixing valve at the tap to speed up warm-up without wasting water.
At least one before each bathroom so you can cut the hot water if you need to repair a pipe or tap without draining the entire loop. We also add a master isolating valve at the unit.
