Site and capacity survey
bathroom count and available pressure assessed before any unit is chosen

Capital
Central heater installation in Daiya starts with checking cold water supply and power on the ground floor or annexe. We choose a unit location away from bedrooms and route distribution pipes to every bathroom. We fit the circulation pump, test pressure and temperature, then hand over.
Daiya houses near the British School feature spacious annexes and high roofs that allow central heater placement with flexibility. We inspect the rooftop cold-water tank first because the heater needs steady pressure from above, and we route hot pipes from the unit through insulated ceiling voids with extra wrapping. Where the annexe sits far from the majlis, we fit a strong circulation pump to ensure hot water reaches every outlet immediately.
Daiya lies in Kuwait governorate near Daiya Park, a family residential zone with detached annexes requiring long hot-water runs.
Water temperature is measured at every tap five minutes after the pump starts to confirm heat reaches the farthest outlet.
bathroom count and available pressure assessed before any unit is chosen
tank secured on brackets rated for full operating weight
supply and return lines run at correct fall to prevent stagnation
gas or electrical feed connected with ventilation confirmed before start-up
expansion valve and drain-off valve fitted as standard safety requirements
every joint checked for leaks under pressure before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
Yes, but we need a strong circulation pump to push hot water across the distance. We insulate the pipes heavily to minimise heat loss en route.
Very much, because the heater needs steady pressure from the tank. We measure tank height, depth and water reserve to select the right heater capacity and pump power.
