Site and capacity survey
bathroom count and available pressure assessed before any unit is chosen

Hawalli
Central heater installation in Jabriya serves spacious villas near Mubarak Hospital and American University. We place the boiler away from main living areas given the home's large size. Hot and return pipes branch through multiple floors to each bathroom. Pressure and temperature are tested at every connection before handover.
Large Jabriya villas have multiple bathrooms spread over four or five storeys, needing a powerful boiler and large expansion tank. We install the boiler in a dedicated ground-floor or roof utility room away from bedrooms. Main pipes and branches run in thermally insulated metal channels to cut losses across long distances. We add isolation valves to main pipes so maintenance can isolate any bathroom without stopping the whole system.
Jabriya sits in Hawalli governorate with large villas near Mubarak Hospital and American University of Kuwait.
A programmable thermostat is installed on the main floor to control hot-water temperature by time of day and household use.
bathroom count and available pressure assessed before any unit is chosen
tank secured on brackets rated for full operating weight
supply and return lines run at correct fall to prevent stagnation
gas or electrical feed connected with ventilation confirmed before start-up
expansion valve and drain-off valve fitted as standard safety requirements
every joint checked for leaks under pressure before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We use large-diameter copper pipes with thick thermal insulation to preserve water temperature. If distance exceeds eighty metres, we add a small recirculation pump near the distant bathroom or an attached electric instant heater.
No, central heating delivers water at one temperature to all bathrooms. But each mixer tap can blend hot and cold water as needed, giving each user choice without affecting others.
