Site and capacity survey
bathroom count and available pressure assessed before any unit is chosen

Jahra
Central heater installation in Kabd begins by understanding the building's hot-water need by horse count, stables and bathrooms. We select a high-capacity unit and run lines with extra pumping to distribute water across long distances within the farm.
Kabd includes horse farms, racing facilities and stables, with buildings spread across wide land. Bathrooms sit in the stable block with no roof tanks everywhere, so we install an extra expansion tank next to the boiler. Long copper runs need strong thermal insulation because water loses heat over distance. We add a powerful circulation pump to ensure steady flow to distant bathrooms.
Kabd sits in Jahra governorate, a sprawling agricultural district of horse farms, pasture and racing facilities.
We calculate heat loss per hundred metres of uninsulated copper to determine correct boiler size.
bathroom count and available pressure assessed before any unit is chosen
tank secured on brackets rated for full operating weight
supply and return lines run at correct fall to prevent stagnation
gas or electrical feed connected with ventilation confirmed before start-up
expansion valve and drain-off valve fitted as standard safety requirements
every joint checked for leaks under pressure before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
We size the boiler for peak load. If the main bathroom runs four taps and the horse wash two, we choose a unit that covers six at once. We add a large expansion tank to absorb pressure spikes under high demand.
We wrap hot and return pipes in thick 35 mm foam. We heat water slightly higher and leave the pump running through night. If power fails we open drain taps at far ends to purge water and air.
