Site and capacity survey
bathroom count and available pressure assessed before any unit is chosen

Capital
Central heater installation in Qibla delivers hot water to every bathroom and the kitchen from one unit instead of separate appliances. We select the mounting position near the main inlet, run distribution and return pipes through walls and ceilings, and test pressure and flow at every outlet.
Qibla commercial and residential buildings hold flats, clinics and offices with bathrooms spread across multiple levels. A central heater must be mounted in a ground room or plant room near the street entrance to cut travel distance for hot water. We slope the pipes carefully and fit isolation valves at each bathroom so individual repairs can be done without draining the whole loop.
Qibla in Kuwait City sits beside Gulf Road, a mixed commercial zone of multi-storey residential and office buildings.
We test the return line by measuring temperature at each bathroom to confirm circulation works across the long pipe runs.
bathroom count and available pressure assessed before any unit is chosen
tank secured on brackets rated for full operating weight
supply and return lines run at correct fall to prevent stagnation
gas or electrical feed connected with ventilation confirmed before start-up
expansion valve and drain-off valve fitted as standard safety requirements
every joint checked for leaks under pressure before handover
How we work

Tell us what is happening and where, and the right equipment is loaded before we arrive.

We film the line from inside and know the kind of blockage and its exact place. No guessing.

High pressure water, a machine or a drain snake, whichever the line actually needs.

The camera runs a second pass and you see the line clear with your own eyes before we leave.
Same method, same equipment. Only the size of the job changes.




Why us
Amana means trust. Someone else's home is not ours to be careless in.
Do not take our word for it. Look at the line yourself.
Breaking is the last resort, never the first step.
A blocked line does not wait for the morning.
Six governorates, 139 areas.
For buildings and complexes, servicing before the problem starts.
Restaurants, offices and complexes, not only homes.
Common questions
Need someone now? The emergency line is open any hour.
+965 9668 4964
In a plant room on the ground or first floor near the main entrance. This shortens the vertical runs and makes maintenance easier when needed.
Yes, we wrap the pipes in foam insulation before the walls close to cut heat loss through external walls. Insulation keeps the water hotter and reduces the wait time when you turn on a tap.
